Forecast overrides: give temporary changes an expiry date

Consider a hypothetical distributor planning a promotion. The usual forecast is 100 units a week. The operations lead raises it to 140 for two weeks. That change has a reason. The problem to test comes later: the promotion ends, but someone copies the adjusted sheet into the next buying cycle. Is the extra demand still expected, or has a temporary assumption become the default?

McKinsey's article on agentic business planning argues that improving forecasts also requires changing the work around them. It says many organisations don't systematically measure whether human overrides improve accuracy. That's a useful question for a smaller purchasing team.

I'd test a modest control before adding more forecasting software. Preserve the original forecast. Record the adjustment separately. Give it a defined period and a review date. Then compare both versions with what happened. This is a proposed control, not a reported customer result. Keep the work in three phases: Diagnose, Build, Prove.

Diagnose the assumption, not just the number

Use SITARAM to organise the work, in order. Start with one product group and one planning cycle. The Systematic starting point is to trace how a forecast becomes a replenishment proposal. Open the actual files. Find where the forecast was produced, who changed it and which version purchasing used. Don't assume the latest spreadsheet explains the decision.

Intelligent insights means deciding what deserves investigation. In this example, ask whether the promotion uplift survived beyond its two intended weeks. Check the dates and the purchasing calculation. An extra quantity might instead come from a minimum order size, a longer lead time or a stock correction. Don't label every increase a forecast override.

Keep demand and purchasing separate. A forecast estimates demand. A buying decision also needs stock on hand, incoming orders and supply constraints. The question here isn't whether the business bought 140 units. It's whether an unsupported demand adjustment influenced the next decision.

Preserve a comparison you can trust

Tactical discovery is where you recover a fair comparison. Save the unadjusted forecast as it stood when the decision was made. Save the adjusted version beside it. Use the same product, location, demand period and forecast horizon. Comparing a forecast made four weeks ahead with one made yesterday won't isolate the value of an override.

If the original wasn't saved, say so. Don't rebuild it from memory and call that a baseline. Start keeping snapshots from the next cycle. Record the evidence available at the time, too. A promotion plan, a customer's estimate and a confirmed order aren't interchangeable.

Choose the outcome you'll compare before seeing the result. If you use units sold, flag periods when stock wasn't available. Low sales during a stockout don't establish low demand. Record cancellations separately so you can review what changed after the forecast was set. Keep flagged periods visible rather than quietly removing awkward results.

An unresolved flag means the comparison needs investigation. It isn't permission to invent a demand number that makes either forecast look right.

Build a record with a defined end

Alignment means agreeing who can change, renew or retire an adjustment. Name a planning owner and a backup. Set the authority for changing purchasing proposals and customer commitments separately. A review notification is useless if everyone thinks someone else will decide.

Restructuring means giving the override its own record instead of overwriting the base quantity. Include the original and adjusted quantities, the product and location, affected periods, reason, evidence, owner, review date and decision history. A row in the existing workbook is enough to test the idea.

The end date and review date do different jobs. The end date limits the periods the assumption covers. The review date prompts a decision early enough to affect the next buying cycle. Put it before the relevant purchasing deadline, not after the goods have been ordered.

In the hypothetical promotion, the uplift applies to two specified weeks. Extending it requires fresh evidence and a recorded decision. Don't delete its history when it ends. Keep confirmed customer orders separate from tentative demand. Check that the same order hasn't been counted both as an order and as an extra forecast uplift.

Automate the reminder, not the buying decision

Automation is step six. It follows the decision rules, not the other way round. Start by flagging overrides nearing review and preparing the original-versus-adjusted comparison. A spreadsheet filter may be enough. Add reminders only when the owner knows what action each reminder requires.

When the review date passes, mark the assumption as overdue and send it to the named owner or backup. Don't silently renew it. Don't automatically remove it from an active purchasing proposal either. A person should confirm what changes, with the supporting evidence visible.

Test that behaviour with dummy records before using it in live planning. Try an expired promotion, a missing owner and an adjustment affecting several weeks. Check that an overdue review doesn't rewrite an existing purchase order. Keep people responsible for changes that affect money or customers.

Treat passing those checks as evidence that the control works as specified. It isn't evidence that stock or cash outcomes improved.

Prove whether the adjustment earned its place

Mechanism is the recurring check that keeps the control useful. Review completed periods on a fixed schedule. Compare the saved original and adjusted forecasts against the same outcome, using the same error measure. For a first test, absolute error in units is easy to inspect: the distance between forecast and outcome.

Continue the hypothetical example. Suppose the original forecast was 100, the override was 140 and the recorded demand outcome was 110, with no stockout flag. The original missed by 10 units. The override missed by 30. In that illustrative period, the adjustment made the forecast less accurate. That's arithmetic, not evidence of a customer outcome.

Don't decide the policy from one period. Review several completed periods and separate reasons for adjustments. Promotion estimates may behave differently from expectations about a large order. Look for where judgement helped, where it hurt and where the evidence remains incomplete.

Track overdue reviews, stock availability and inventory alongside forecast error. Assess review completion separately from commercial benefit. Don't claim inventory benefits before a relevant replenishment cycle has completed. Better forecast accuracy alone isn't proof that purchasing improved. Inspect what was actually ordered and why.

A temporary forecast change shouldn't become a permanent buying rule.

Start with the next buying cycle. Pick one product group. Save the original forecast before anyone edits it. Find one temporary adjustment and give it an owner, affected periods and a review date. Agree what happens if nobody reviews it.

Once the period closes, compare both versions honestly. You don't need a new planning platform to start asking whether the change earned its place.